Cherrywood Development

Cherrywood Development

HomeProjectsSports / Hoarding / GatesHoardingCherrywood Development

Client: Hines Cherrywood Development
Contractor: John Cradock Ltd/ Jons Civil Engineering JV

Project Detail

The Cherrywood Development is situated at the foot of the Dublin Mountains, minutes away from the sea and is serviced by the Luas Line and the M50 Motorway ensuring excellent access to Dublin City and Airport. The Development includes an existing 53,000 square metre office park and a 390 acre master planned development site, which will consist of a new retail-led mixed use Town Centre along with over 3,500 apartments.

In addition, there will be 5km of internal roadways, a number of parks will be built such as the 13 acre Beckett Park, 22 acre Tully Park and the 47 acre Ticknick Park.

Mulligan Fencing supplied and installed 1600mtr of Hoarding with concrete lego block used as ballast.

Cherrywood Hoarding Cherrywood Hoarding Cherrywood Hoarding Cherrywood Hoarding Cherrywood Hoarding Mulligan Fencing Hoarding Fencing Cherrywood Dublin Ireland

Fencing Requirements

Exterior Grade Plywood Hoarding x 1600mtr (1700 sheets of Plywood)
Concrete Lego Blocks x 820 (1230 ton)

Project: Cherrywood Development